Transit Headquarters Expansion Project

  • 150 000 ft2
  • 8 months of work
  • $18 million in investments

Right before its 50th anniversary, Transit is launching a major expansion project of its head office and distribution center located in Levis, Quebec. Stephan Guay, President of Transit, aims to triple the business’ revenues in 5 years, and had to rethink and modernize the infrastructure to meet the target.

Phase II : Automation in 2021

In order to always better serve its customers, Transit will invest in the future to gain productivity. To that extent, the company plans to acquire and integrate robots in the new space.

Work in progress

Come back from time to time to see the progress of the project!

News

From most recent to oldest

Two photos show a modern office Expansion Project under construction with large windows, open space, a multipurpose staircase, and abundant natural light. The area looks bright and spacious, with unfinished floors and minimal furniture.

Three people wearing safety vests and helmets stand in a large, newly constructed warehouse with tall blue and yellow storage racks. They are posing and smiling, celebrating the official completion of the Expansion Project.

A warehouse with large stacks of metal shelving racks neatly arranged on the floor, ready for assembly as part of an Expansion Project, with a high ceiling and industrial walls in the background.

A partially constructed steel structure inside a large industrial warehouse, with scaffolding and metal frames visible. The image includes a play button overlay and text about a guided tour of Transit Inc.s operations.